Create days off
Create days off to use in scheduling. A day off is a scheduled rest day for an agent. The day off settings define how long the day off must be and how flexible the placing of the day off is. The number of days off for an agent during a schedule period is defined by the agent's contract schedule.
Often, it is enough to create one day off that is 24h long. For some situations, additional days off are necessary.
EXAMPLE The call center is open 24/7 and uses flexible scheduling. Some weeks, the agents have only one day off. A 36h day off is in some cases needed to fulfill the 36h weekly rest set on the contract.
NOTE The automatic scheduling and optimization processes will only use one day off, even if there are several. The day off that comes first in alphabetical order will be used.
Prerequisites
- You have the Scheduling settings permission.
Page location
WFM > WFM settings > Scheduling settings > Days off
Procedures
Create a day off
Create a day off and define how it can behave.
EXAMPLE The target length of a day off is 36h and the anchor is at noon. The day off by default starts at 6 PM the day before the day off and ends at 6 AM the day after. The flexibility is 3h. If a shift ending at 9 PM is scheduled the day before the day off, the earliest possible start time for a shift on the day after the day off is 9 AM.
- Click Add new day off.
- Enter a Name for the new day off.
- Enter a Short name for the day off, with a maximum of two characters. The short name is displayed for days off where the space is limited.
- Enter a Payroll system code. This is used in payroll exports to define the compensation.
-
Enter an Anchor time.
Set the anchor time to where you want the middle of a day off to be. The day off extends equally long before and after the anchor time.
-
Enter the Target length.
The target length defines the minimum hours of non-work time for the day off. This is counted from the end of the shift the day before the day off until the start of the shift the day after the day off.
-
Enter the Flexibility.
The flexibility defines how many hours a day off can be pushed in either direction to adjust for a late shift before the day off or an early shift after it. Only a shift can push a day off. If there are two days off in a row and one of them is pushed 3h, they will have a 3h overlap.
- Click Save. If you do not want to save the day off, click Discard changes.
Edit a day off
- Click the edit icon for the day off that you want to edit.
- Edit the fields, where necessary.
- Click Save. If you do not want to save the day off, click Discard changes.
Clone a day off
- Click the copy icon for the day off that you want to copy.
- Edit the fields, where necessary.
- Click Save. If you do not want to save the day off, click Discard changes.
Delete a day off
- Click the trash can icon for the day off you want to delete.
- Click Delete for the confirmation question.
Related topics